small wire drawing machine
$20000-80000 /Set/Sets
Payment Type: | L/C,T/T |
Incoterm: | FOB,CFR,CIF,EXW |
Min. Order: | 1 Set/Sets |
Transportation: | Ocean,Land |
Port: | Shanghai |
$20000-80000 /Set/Sets
Payment Type: | L/C,T/T |
Incoterm: | FOB,CFR,CIF,EXW |
Min. Order: | 1 Set/Sets |
Transportation: | Ocean,Land |
Port: | Shanghai |
Model No.: LZ
Brand: WANYI
Status: New
Video Factory Inspection: Provided
Mechanical Test Report: Provided
Marketing Type: New Product 2020
Core Component Warranty Period: 1 Year
Core Components: Bearing, Engine, Motor, Plc, Gearbox
Place Of Origin: China
Warranty Period: 1 Year
Core Selling Point: Famous Brand Plc
Out-of-warranty Service: Video Technical Support, Online Support, Spare Parts, Field Maintenance And Repair Service
Applicable Industry: Manufacturing Plant
Where To Provide Local Services (in Which Countries Are There Overseas Service Outlets): None
Showroom Location (in Which Countries Are There Sample Rooms Overseas): None
LZ600 Wire Drawing Machine operation manual
1. 1 Professional and technical personnel are required to carry out installation and commissioning. Before use, it is necessary to carefully read this manual and the relevant electrical instructions provided.
1. 2 Each machine and electric control cabinet shall be reliably grounded with a grounding resistance not more than 4Ω.
1. 3 There should be no accumulated water on the table top, especially near the operation box, as it can easily lead to circuit failure due to water infiltration.
1.4 It is prohibited for multiple people to operate the same equipment at the same time to avoid accidents.
1. 5 The electric control cabinet should be placed in a clean and dry room, and the door should be closed when working to prevent dust intrusion from causing device performance degradation or failure. Air conditioning is used to maintain the ambient temperature of the electric control cabinet. Frequently check the operation of the cooling fan on the top of the electric control cabinet.
1. 6 Before starting the machine, check whether the safety device is normal.
1. 7 Do not operate the components in the electrical cabinet with power. After cutting off the main power supply, wait at least five minutes, and wait until the intermediate circuit capacitance is discharged before operating the frequency converter, motor, or motor cable.
1.8 Do not touch the IC circuits on the inverter control interface board and motor control board, as static electricity may damage these circuits.
1.9 Please provide the power supply and operating environment according to the technical requirements of Section 3.2. It is not allowed to arbitrarily change the parameters of the frequency converter and PLC. The user shall be responsible for any damage to electrical components caused by human factors.We can offer wire drawing machine,Layer Winding Machine,Flux Cored Wire Forming Machine,butt welding machine,pointing machine,annealing furance and so on.
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.